Complete PET bottle blowing, filling and packaging line. The line existing out: 1x Tilting device (supplies preform feed unit with preforms), Preform feed unit (Krones, Contifeed RS), 1x Stretch-blow moulder (high-speed Krones, Contiform 314, 14 blowing stations, recovery of blowing air), PET inspector (PET-VIEW 776D), Bottle filler and capper (Krones Modulfill NWJ VP GW PET 2.160-60-113, electronic weighing filling system, 2 filling speeds, filling is contact free in full-jet process which guarantees a high micro-biological safety as the return gas has no contact with the product, 60 filling valves, filler pitch of 113 mm, filling system designed for filling conductive non-carbonated water, CIP cleanable, Siemens ET200S CPU PLC and Zalkin 20 head capper with preform cap unit with cap conveyor SBF), 3x Inspection machines (Krones, Checkmat 731), Inkjet (Videojet), Bottle weigher (HC-VA-3000-3), Lineair rejection unit (083S), Bottle check weighing system for periodic check of the weight of the bottle through bypass of the mainstream (Mettler Toledo), buffer system for filled bottles in case of the end of line packaging is stopped, Sleeve labelling machines (Krones Sleevematic M 2, handling of shrink sleeves, 2x Multireel S 6-235 storage with 6 sleeve reels buffer system), Steaming tunnel (Krones, Shrinkmat 5000), Packer for packing loose bottles in wrap around cartons (Meypack, VP532, high speed tray lid packer with 3 fully automatic lidding stations, carton with a bottom and a top part, can be presented as display in supermarket), level up spiral conveyor of ready product and all interconnecting conveyors (Krones SYNCO S) with belt grease devices, stainless steel frame work, piping, valves and cabling around the machines. Signal Exchange by Ethernet (Siemens). Excluding palletisers (Krones Modulpac 1A), stretch wrapper and all format sets (supplier ownership). Including all available manuals and all programs. Original order confirmation with all details can be sent on request. The line will be sold by the Supplier because of a change to the production location. Video of the complete line in production can be seen on our website. A visit to see the line in production is possible till September 2022. Dismantling needs to be in October 2022.
Download pdf